View all testimonials

Tadcaster Community Swimming Pool

Chris Porter, Facility Manager , Tadcaster Swimming Pool “The team worked out of hours to install the Powerstar Voltage Optimisation unit. It was a straight forward process with good energy saving results. I would recommend EMS to other organisations looking to save energy.”

W Brewin Ltd – Textile Manufacturer

Paul Spence,  Finance Director, W Brewin “The operational aspect of the units has been 100% reliable – We have been very pleased with both the units and service provided by Powerstar”

Atlas Insurance – Malta

Matthew von Brockdorff, Atlas Insurance “We are extremely pleased with the outcome and very glad that we have made the investment. Well done and thanks again”

The town of Emmitsburg, Maryland, USA

Mr. Don Briggs, Mayor, The town of Emmitsburg, Maryland, USA “As elected officials we are always researching opportunities that will reduce our dependence on consumable resources. This creates a win-win as we are not competing with our citizens and local industries for these finite resources. We chose to install...

European University Cyprus

Michalis Mavros, Health and safety officer, European University Cyprus “EMSc (Cyprus) worked with a high level of professionalism to ensure that during the installation of Powerstar and the verification process, the operation of the university wouldn’t be interrupted. The saving results have exceeded the guaranteed savings therefore the payback...
European University Cyprus

Ten Manchester Street Hotel

Jason Dalgarno, Maintenance Manager “We are highly delighted with the service provided from Powerstar and the great savings we have received with such a low payback period.” 

St John’s School & Sixth Form College

Mr Alan Greensitt, Director of Finance and Resources “Many thanks to EMS for a professional service provided.I can highly recommend voltage optimisation as a energy saving & power quality solution to the education sector.” Philip Halse, Electrical Associate, DTA Consulting Engineers “DTA worked with EMS on the provision of voltage...
Voltage Optimisation in Schools

Carlsberg Group (Photos Photiades Breweries)

Marios Sarris, Electrical Engineer & Automations Manager, Photos Photiades Breweries “A year after the installation of PowerStar unit at our premises and upon reviewing the significant saving results in electricity consumption we decided to install a second system.”
Voltage Optimisation in Breweries

Holmfirth Dyers

Geoff Goodman, Financial Controller, Holmfirth Dyers “The Powerstar system has allowed us to make energy savings, reduce our carbon footprint and at the same time replace our transformer. We are very pleased with the HV MAX system and the level of service provided.”
Holmfirth Dyers