Voltage Optimisation Installation

Powerstar arrange for the voltage optimisation installation to take place at a date and time suitable for the clients business to ensure no disruptions to business operations wherever possible during the installation.

The voltage optimisation installation will be carried out either by our own installation teams or through approved Powerstar installation contractors –  All subcontractors are NICEIC registered and have undergone a competency verification procedure. A list of the current approved subcontractors is available on request through the contact form and we may use any one of them to install Powerstar on a clients site.

TYPICAL POWERSTAR VOLTAGE OPTIMISATION INSTALLATION

Lift and Position

The Powerstar installation team will clear the working area, deliver the Powerstar
unit to site, lift equipment into selected area and construct ramp and prepare the route.

Electrical Prep Work

The next stage is to prepare the working area, prepare cable entries on new equipment, install cable containment, install new cable and test the new circuit.

Shutdown & Changeover (generally 2-4 hours)

The final stage will see the Powerstar installation team isolate and lock existing circuits, connect into distribution board, make the final connections, energise the circuits and complete the testing and commissioning.

Do you need further information?

REGISTER FOR OUR EVENTS

    LATEST NEWS

    October 2016: Powering energy savings in South Africa

      Powerstar South Africa, a distributor for market leading energy storage and voltage optimisation brand Powerstar, is currently saving Pick n Pay, South Africa’s second largest supermarket chain store on average over 8% in electricity costs across two of its stores. The company, which is enjoying its largest period of growth since entering the market

STAY IN TOUCH WITH US...