Grid View Map View

NHS: Rotherham General Hospital

Powerstar were engaged to replace a large hospital’s existing Uninterruptible Power Supply (UPS) system with a more efficient, intelligent Battery Energy Storage (BESS) alternative.

Wienerberger Ltd

Powerstar was commissioned to replace the site’s ageing transformer with modern, low-loss replacements, that incorporated voltage optimisation technology to provide more stable voltages across the site.

PFF Group

Powerstar identified PFF Group’s aging transformers as a a potential power resilience risk, as well as an area where their energy efficiency could be significantly bolstered.

AESSEAL® (UK)

AESSEAL needed help protecting their operations from power disruptions while driving forward net zero strategies.

MI Dickson

Consumption of this site has decreased by over 8,000 kWh after the Voltage Optimisation installation, despite production volume being increased by almost 10%