Skip navigation
Powerstar

Power resilience for a net zero world

Contact Us

Case Studies

Grid View Map View

Racing Engine Manufacturer

This racing engine manufacturer was struggling with grid constraints blocking the installation of vital new equipment.

Aerospace Manufacturer

A global leader in the manufacture of landing gear, suspension and tram coupling bearings was suffering significant scrappage caused by power disruptions.

Cutting and Wear

This Installation gave an annual reduction on energy consumption of 9.5%, and carbon reductions of 58.7 tonnes per annum. An Annual saving of 107,659 kWh

Armley Moor Health Centre

Voltage optimisation reduced energy usage by 7.9% at this Health Centre and cleaned the Powersupply to reduce the need for equipment repairs

South Staffordshire Council

South Staffordshire Council were looking to install a battery energy storage system that provided them with site-wide UPS resilience

Stoba Prazisionstechnik UK Ltd

Stoba is a mass manufacturer and supplier of metallic parts and high quality components to the automotive industry that operates internationally.

What our customers say

Cookies

This website uses cookies. You can read more information about why we do this, and what they are used for here.

Accept Decline