Racing Engine Manufacturer
This racing engine manufacturer was struggling with grid constraints blocking the installation of vital new equipment.
This racing engine manufacturer was struggling with grid constraints blocking the installation of vital new equipment.
A global leader in the manufacture of landing gear, suspension and tram coupling bearings was suffering significant scrappage caused by power disruptions.
This Installation gave an annual reduction on energy consumption of 9.5%, and carbon reductions of 58.7 tonnes per annum. An Annual saving of 107,659 kWh
Voltage optimisation reduced energy usage by 7.9% at this Health Centre and cleaned the Powersupply to reduce the need for equipment repairs
South Staffordshire Council were looking to install a battery energy storage system that provided them with site-wide UPS resilience
Stoba is a mass manufacturer and supplier of metallic parts and high quality components to the automotive industry that operates internationally.
“Powerstar were great throughout this process. From explaining how the technology worked, throughout installation and into verifying the savings we were making. A great company to partner with if you’re looking to reduce your energy consumption.”
Chris Hayman, Managing Director, M I Dickson
“Powerstar voltage optimisation has been a major part of our comprehensive energy efficiency programme. It is perhaps the simplest and most effective way to instantly save energy and therefore we would highly recommend Powerstar systems.”
Mark Orpin, Head of Energy Management at ASDA Supermarkets
“We have been very pleased with the quality and workmanship from the team at Powerstar – the energy savings have been higher than forecast and we are expecting to run a phase 2. Powerstar has been very flexible in scoping, design and working around our operational units to ensure full services were maintained. I have no hesitation in recommending Voltage Regulation from Powerstar and we are pleased with the full service Powerstar provided.”
Stuart Harris, Head of Energy and Carbon Operations at BT Technology, Service & Operations
“Powerstar identified waste that we did not think we had. They diligently overcame issues during commissioning and have provided us with a fault free system that saves what they promised.”
Mark Boxall, Managing Director at Tetra Pak CPS Ltd
“We would highly recommend Powerstar Voltage Regulation systems. The Powerstar installation at Scott Clinic, Mersey Care NHS Trust has achieved an 18% saving on total electricity consumption. This is an excellent result which is helping the hospital to meet its CO2 reduction targets. Powerstar Voltage Regulation has shown that significant savings can be achieved without compromising the operations of the hospital.”
Mark O’Grady, Managing Director at MITIE Engineering (North) Ltd
“We are absolutely delighted with the Powerstar system which has reduced our direct electricity and carbon emissions by 16%. I have no hesitation to recommend Powerstar to others.”
Stephen Ward, Senior Electrical and Mechanical Engineer at Sheffield Hallam University
“We have experienced no issues or problems with the Powerstar equipment we have had fitted for the past year. The kit is robustly manufactured and electrically sound.”
Peter Gardiner, M&E Manager at Lincolnshire Co-operative
“With the ability to power our site for up to two hours the Battery Energy Storage System should cover us for all but the most severe and long-term power outages, thereby maintaining the operation of our critical kilns and protecting our products and production schedules. Given the damaging impact that interruptions to our power supply have caused for such a long time, and the added benefit of reducing our energy consumption and providing an additional revenue stream, the solution provided by Powerstar was a no-brainer for our business.”
Simon Parkinson, Managing Director of Parkinson-Spencer Refractories Ltd
Cookies
This website uses cookies. You can read more information about why we do this, and what they are used for here.