The leisure sector was one of those most impacted by the energy crisis, with surging energy prices forcing leisure centres across the country to shut or cut down on services and opening hours.
CUSTOMER
Billingham Forum is a large leisure complex in Billingham, UK, operated by Tees Active Ltd. Billingham Forum was constructed in 1967 and was given an £18.5 million re-development in 2009. The forum offers a wide range of facilities including: an ice skating rink, a swimming pool, an Activ8 gym, fitness classes, squash courts, an indoor climbing centre, and a theatre.
Tees Active Ltd is a charitable leisure management organisation that was established as a non-profit distributing company on 1st May 2004. Working very closely with the Stockton-on-Tees Borough Council, the company specialises in the management of facilities and projects with the aim of raising levels of physical activity within the community. Per year, Tees Active welcomes almost 2 million visitors to its facilities and employs around 219 staff.
Challenge
Tees Active Ltd is a non-profit-distributing company that was looking for ways to reduce energy consumption and costs in a number of its leisure facilities. Billingham Forum is central to the surrounding community and operates 7 days a week to meet the demand. The Forum offers a wide range of activities, which requires an extensive variety of electrical equipment to operate at any one time.
Due to these characteristics, Powerstar identified Billingham Forum as a potential candidate for voltage optimisation technology which was confirmed after a series of thorough site surveys and in-depth evaluation of the site’s voltage profile.
The incoming voltage at Billingham Forum was found to be stable but higher than required for the majority of on-site equipment, making voltage optimisation a perfect solution to correct the facility’s overvoltage and assist in reducing electricity consumption and offering the electrical equipment longevity by supplying an optimal voltage.
Solution
Following a full site analysis of the Billingham Forum, the Powerstar team recommended the installation of a 750kVA Powerstar VO-LITE system with a fixed 15V reduction. Due to the nature of the leisure facility, a seamless installation was required which Powerstar fulfilled with minimal disruption to the facility’s daily operations and without negative impact to the experience of the visitors
Results
Powerstar provided a concept to completion service with a fully supported, turnkey solution which is reducing the facility’s annual electricity consumption by 189,591 kWh, which equates to annual consumption savings of 8.8%, exceeding the site’s guaranteed minimum saving.
8.8%
Annual consumption saving
& An annual kWh saving of
189,591kWh
“We found working with Powerstar to be very easy as they did everything they could to accommodate our requirements not only in which unit was best suited to deliver the greatest efficiency, but also in ensuring minimum disruption. Work was carried out overnight which meant that there was no disruption to our operational hours and our customers. This is one of the simplest ways to achieve instant cost effective energy savings and would highly recommend Powerstar.”
Dennis Smith, Project Manager, Tees Active Ltd
The cheapest and greenest energy is the energy you don’t use.
Are you worried about the ever-rising cost of electricity for your business? Find out how much money you could save by completing our 2-minute Energy Saving Calculator.
Grab a recent electricity bill, fill out a few details and within just a few minutes you will have a savings estimation.
Contact us today to find out how we can support your organisation’s energy objectives with voltage optimisation
The leisure sector was one of those most impacted by the energy crisis, with surging energy prices forcing leisure centres across the country to shut or cut down on services and opening hours.
Optimising the incoming voltage to your site to improve quality, saving energy and costs.
Use power more intelligently and effectively to reduce your business/organisation's energy bills and electricity costs.
Increase the efficiency of your site’s energy to reduce costs and CO2.
The Boardwalk Hotel reduced its Energy Consumption by an impressive 24% & an annual reduction in electricity consumption of 643,103kWh
Powerstar VO-LITE voltage optimisation system helps to ensure they reduce their emissions by 8.5% as a venue as well as save money too
The installation of the Powerstar LITE system reduced the facility’s annual electricity consumption by 70,326 kWh, equating to annual consumption savings of 10.2%.
Thornaby Pavillion reduced their annual electricity consumption by as much as 43,682 kWh, equating to annual consumption savings of 11.5%